Module 6 | Quiz Quiz

person Mike Close
event June 19, 2020

Please sign up for the course before taking this quiz.
  1. 1. Prior to installation, the following information should be provided to an overhead crane installer, EXCEPT:

    1
  2. 2. Per OSHA 1910.179 Overhead & Gantry Crane Regulations, your new crane system will need to have two operational tests, plus a rated load test performed prior to initial use.

    1
  3. 3. What factor is typically most important to the customer when installing an overhead crane in an existing facility?

    1
  4. 4. When installing a new overhead crane system, existing crane runways cannot be utilized.

    1
Back to: Module 6 | Quiz
warning
Disclaimer:

Any advice, graphics, images, and/or information contained herein are presented for general educational and information purposes and to increase overall safety awareness. It is not intended to be legal, medical, or other expert advice or services, and should not be used in place of consultation with appropriate industry professionals. The information herein should not be considered exhaustive and the user should seek the advice of appropriate professionals.